Coleraine Academical Institute

CLIENT Coleraine Academical Institute
MAIN CONTRACTOR Irwin M&E Limited
DURATION 8 months
Coleraine Academical Institute

Extensive refurbishment works within existing School to include mechanical, electrical and builders works.

The School remained occupied over the 8 month period with works phased to suit the requirements of the school particularly in relation to exam timetables during the contract period.

Mechanical works included; Full Replacement of Mechanical Equipment, conversion of main heating sources to natural gas, including all necessary pipework and control system alterations and replacements.

Electrical Works included; general services upgrade including replacement/renewal of main electricity distribution system throughout the School including installation of new earthing system and protective devices. Also included was a new emergency lighting system throughout the school, with new general lighting installed on circulation spaces and stage lighting installation.

Builders works included; general builders work associated with the above including replacement ceilings, insulation works, fire stopping and general attendances with floor finishes to be protected and circulation spaces to be re-painted.